N
aOCP

Santa Isabel Water and Soil Credits

Santa Isabel
8 hectares
ActiveWater Project
Project Description

Activities conducted in the Soil regeneration project in Soto, Ángel Trías, Chihuahua, included drawing contour lines across a 13.4-hectare area using a laser level to prepare for ditch opening. This contouring followed a board ditch design, with a 6-meter separation between lines, to facilitate soil retention and expedite water capture and infiltration. Soil works conducted included excavating a trench board with dimensions: 30 cm deep and 40 cm wide. This trench was designed to enhance rainwater retention and infiltration, as well as to create access roads for various reforestation tasks. Finally, 4,232 Prosopis glandulosa (Mesquite) plants were transported to the project site for planting.

0
Certification Timeline
Project progress through the aOCP process

PSF Submitted

Project Submission Form completed

August 19, 2023

Project Validated

Validation completed by accredited VVB

August 3, 2024

Credits Issued

Nature-Positive credits registered in the aOCP registry

March 19, 2025

Project Activated

Project active in the aOCP registry

August 19, 2023

Project Active

Generating verifiable Nature-Positive credits

Available Documents
Official certification documents

Click to download official certificates

Project Information

Project Type

Water Project

Location

Santa Isabel

Project Area

8 hectares

Status

Active
Project Activities
2 eligible activity verified under the aOCP standard

Restauración de ecosistemas

  • 11Reforestación con especies nativas
  • 15Regeneración de suelos erosionados mediante revegetación

aOCP Certified

Project certified under the aOCP standard (ases On-Chain Protocol)

Verified by accredited VVB